Previous Projects

o   Installing the electrical network of the second region in Borg Al Arab city, Alexandria, Egypt, that includes one of 10 MW distributor, twenty of 500 KW transformer and about 1500 electric light pole.

o   Installing the fire alarm and fire fighting system in both Cairo airport and Alexandria Petroleum Company.

o   Design the airplane fueling control system in Cairo international airport.

o   Design and install the fault illustrator in The American Express Bank.

o   Design and install the control system of the automatic gate of F16 maintenance workshop in Helwan military airport.

o   Design and install the control system of the production line for the Paper Factory of King Marriott.

o   Design and install the control system of the production line for Lime and Gypsum Factory of Borg Al Arab.

o   Design and install the control system of the automatic metal shear of Alexandria shipyard.

o   Testing, system startup, and commissioning of seven stations of sewerage refine with ABB SUSA which includes (current isolators, mathematical equation modules, magnetic flow meters, ultrasonic level transducers, motorized valves, heat detectors, and optical fiber termination).

o   Design and install the PLC, Pneumatic and PCB laboratories for Techno Pro Egypt Company.

o   Design the fire alarm system of Nariman Hospital.

 

 



جميع الحقوق محفوطة ©للوحدة المركزية للبوابة الالكترونية جامعة كفرالشيخ